# CreaTower I

Zug, Zug, Switzerland - 2027

10-storey office building in Zug, Switzerland

The CreaTower I is a 40-meter office high-rise currently under construction in the Tech Cluster Zug. The project is currently in progress, with an expected completion timeframe of 2023/2028.

The 180 RFS bays drastically reduce mass and achieve a 50% saving in CO2 emissions compared to traditional slabs.

We worked directly with the entire design team to optimise the RFS for this high-end project and meet all the acoustics, fire, and vibration requirements while contributing to the striking aesthetic of the building both inside and outside.

| System | RFS-D |
| --- | --- |
| Use | Office |
| Location | Zug, Zug, Switzerland |
| Status | Under Construction |
| End Date | 2027 |
| Size | 6800 m² |
| Client | Urban Assets Zug AG, Zug |
| Architect | Gigon/Guyer and Partners |
| Engineer | WaltGalmarini |
| Contractor | Landis Bau AG |